learningCloud 5.18 - Asignar pre-requisitos (hitos) entre sprints dentro de un canal

Last modified:


14/09/2023

On 14 September we will deploy learningCloud 5.18 whose most important new features are:

Setting pre-requisites (milestones) between sprints within a channel

    Until this version, navigation between stages of a channel was sequential. A user had to complete all the required sprints of a stage before moving on to the next one.

    From this version onwards, the channel author can customise the navigation and set the pre-requisites for each sprint.

    For example, for the second sprint of stage 2, he could set as a pre-requisite:

    • Complete all the sprints in stage 1
    • Complete some sprints on stage 1
    • Complete the previous sprints in stage 2
    • No prerequisites

    From this version onwards, sequential navigation will no longer be enabled by default but all channels created before this version will keep the previous behaviour, i.e. a user must complete all required sprints of a stage before moving on to the next one.

    If you create a new channel, don't forget to set the pre-requisites or lineal milestones

    Image 47830


    This article was helpful for 1 person. Is this article helpful for you?